The Bobwhite Booster Pump Station (BPS) and Ground Storage Tank (GST) project includes building a 2.8 MGD booster pump station and a 500K gallon ground storage tank, located at 717 Bobwhite Road, Lockhart, TX, to accept water from the Guadalupe Blanco River Authority (GBRA) and to supply water to the new FM 2720 water main. This project is undertaken by contractor, Prota, Inc. The estimated construction cost is $6,840,000.00 and construction is expected to be completed by April 2027.