This project involves the construction of 4,275 linear feet of 24-inch water main located along Bobwhite Rd, from its intersection with FM 2720, to the Bobwhite Pump Station (BPS). Currently, this project is in the design phase. The probable construction cost is around $1,546,000.00 and construction is expected to be completed by December 2026.